Project Overview
Building Type | Element Building |
Building Use | Residential Home |
Location | Clonakilty, Co. Cork |
Size | 350 sq m |
Project Timeline / Time On Site | 8 Weeks (8 Days To Assemble Main Structure: Walls, Floors, Roof) |
Remit Included | Full frame, external cladding, windows and doors, roof lights, airtightness & plaster boarding. |
Airtightness | 0.29 Air Changes Per Hour (0.6 Passive Standard) |
U Value on Walls | 0.09 W/m2k |
Specifications:
- Larch Cladding – 375m sq – ( Charred)
- AluClad Triple Glazed Windows Produced – Viking Windows
- Roof Windows Produced – Lamilux
- Glue Laminated Structures (Glulam)
- Aluminum Sills
- Zinc Metal Roof Cover
- Passive Energy Rating
Related Projects
Our modular apartment buildings can be constructed in a variety of configurations from small apartments to larger multi story apartment blocks from 2 to 36 apartments configured in 1, 2 or 3 bedroom options. Call us for more information, send us your plans and we will be happy to discuss your project.
Architecturally Designed Passive House completed in Clonakilty, West Cork.
Available now from Hennessy Offsite, the 3 room, Modular Office Unit. This unit is passive or A1 rated and fitted with electrics.